Video summary

ProEst Training: Integrating ProEst and Procore

Main summary

Key takeaways

Technology

Overview

Concise summary of the ProEst <> Procore integration training video. This guide explains how to enable and configure the integration inside ProEst, map cost types/codes, send estimates to Procore (creating budgets, commitments, and change events), and where transferred data appears in Procore.

Note: This is a summary of the training video content, not a step-by-step transcript.

What this covers

  • How to enable and configure the Procore integration inside ProEst.
  • Mapping between ProEst cost types / sort types and Procore cost codes / abbreviations.
  • How ProEst sends estimates to Procore to create budgets, commitments (purchase orders / subcontract orders), and change events.
  • Where transferred data appears in Procore: Budget, Commitments, Schedule of Values, Drawings, Documents.

Key steps (setup + workflow)

  1. Enable integration

    • In ProEst: System Settings → Company Setup → Integrations → turn on Procore.
    • Enter Procore username/password and log in; confirm a “successfully connected” message.
  2. Configure mappings and options

    • Associate a company template and standard cost codes.
    • Optionally include documents from the ProEst estimate.
    • Map ProEst cost types to Procore cost code abbreviations.
    • Configure creation of sub-jobs (using short type or division).
    • Configure creation of commitments:
      • Define which sort type(s) create a Purchase Order (PO).
      • Define which sort type(s) create a Subcontractor Order (commitment).
    • Click “synchronize now” to import all Procore cost codes into ProEst accounting codes.
  3. Prepare the estimate

    • Ensure every estimate line item has an associated cost code that matches the cost type being used.
    • Use sort types (phases) to create sub-jobs (example: phase 1–5).
    • Associate vendor and subcontractor fields on line items:
      • Lines with a vendor + material cost → will transfer as a Purchase Order in Procore.
      • Lines with a subcontractor + subcontractor cost → will transfer as a Commitment in Procore.
  4. Send the estimate to Procore

    • In Estimate Center: click Edit, change the estimate status to Awarded.
    • Choose to send to an existing Procore project or create a new Procore project (or select None).
    • Save to trigger the transfer.
  5. Verify in Procore

    • Budget: shows breakdown by sub-job with labor / material cost (budget creation).
    • Commitments: shows created purchase orders and subcontractor commitments.
    • Schedule of Values (inside each commitment): individual line items with quantity, unit, unit cost, and total.
    • Drawings: Procore accepts and processes drawings transferred from ProEst.
    • Documents: non-takeoff documents transferred appear under Documents.
  6. Sending Change Events

    • In estimate details, select the target Procore estimate and choose to create a Change Event instead of updating the budget.
    • Save to create a Change Event in Procore; the Change Event lists included line items, unit of measure (UOM), unit cost, and totals.

Practical notes and constraints

  • Mapping and synchronization are required before reliable budget transfer.
  • Item-level vendor / subcontractor associations determine whether a line becomes a PO or a Commitment.
  • You can create sub-jobs from ProEst sort types so they appear as sub-jobs in Procore.
  • Documents and drawings can be included in transfers; drawings may require additional processing time in Procore.

What the tutorial demonstrates (deliverables)

  • Successfully created a new Procore project and budget from a ProEst estimate (including commitments).
  • Successfully created a Procore Change Event from a ProEst estimate.

Main speaker / sources

  • ProEst training video / ProEst trainer (narrator)
  • Destination system referenced: Procore (software platform)

Rate this summary

Your feedback will help improve summaries.

Improve this summary

Reprocess with a stronger model when the summary feels incomplete or inaccurate.

Pro

Translate summary in another language

Pro

Ask questions to this video

Chat for follow-up questions, clarifications, and source-backed answers.

Coming soon

Share this summary

Original video