Dream home build (New Zealand) — overview
- Josh (the speaker) builds his family home for under $500,000 on a difficult sloped section in Upper Hutt, NZ.
- He takes a year off work to focus on the project and shares the build start-to-finish (including setbacks and time-lapses/vlogging).
Site & concept planning highlights
- Target location/area: Upper Hutt suburb; the section is described as “the section nobody wanted.”
- Key site problems identified early:
- Slope
- Shared right-of-way access with two other houses
- Drainage easements across the middle of the site limiting the build platform
- Power lines feeding a neighbor’s house crossing the site (needed to be dropped/undergrounded)
- A protected totara tree near where the garage would ideally go (a no-go zone during the build)
- Final layout choice to work with the land and constraints:
- Basement garage to use the natural slope flow
- Studio next to the garage
- Main house upstairs (one-level): 3 bedrooms, 2 living areas
- Designed to capture north-facing sun:
- Two large outdoor spaces north-facing for midday-to-evening light
Early setback: injury while clearing the section
- He mowed lawns early on and slipped while working on uneven ground/bank.
- Toe injury required:
- Orthopedic assessment
- Surgery (toe cut/open wound; shoe/grass/foreign material removed)
- 4 weeks in a moon boot (off his feet)
- This delayed momentum, but the build continued.
Permitting + planning reality checks
- Josh notes there’s significant pre-build decision-making:
- Product choices, design details, and plan setup must be resolved before much physical progress happens.
- Lead times (e.g., engineers, pre-nailers, etc.) matter.
- Consents reportedly required extensive documentation (auto-captions suggest many “trees” pages—likely indicating lots of paperwork/attachments).
Earthworks, set-out, and foundations
- Establishing heights/lines:
- Uses a story rod/laser and leveling approach to set batter lines and levels.
- Set-out challenges:
- House set-out described as extremely hard due to non-straight boundaries and many corners.
- Foundation engineering approach (unstable/previous gully fill):
- After discovering old gully/filled ground was poor quality deep down, he worked with the engineer.
- Drilled ~450m holes (interpreted as many boreholes) to reach good ground
- 57 holes filled with concrete, then a standard house piling system on top.
- Inspections passed before foundation work started:
- Site/sighting inspections
- Engineer inspection (depth confirmation)
Foundation build approach & milestones
- Due to slope/design, they selected:
- Timber subfloor, but poured a concrete slab for the garage (including footings/perimeter system).
- Ongoing build friction:
- Rain made work harder; tools/gear had to be dried daily.
- A rough day included equipment issues (broken starter cord), minor accidents (clipped neighbor’s mailbox), and delivery mistakes (wrong steel sent).
- Milestone:
- After passing inspections and setup, they prepared to pour concrete, and the build began “getting out of the ground.”
Framing + factory tour / engineered components
- Timber framing used for earthquake resilience and local sustainability.
- Mentions a factory visit near the Kapiti Coast to see truss/frame fabrication offsite.
- Structural moment:
- Installed a major steel beam over the garage:
- Mid-floor uses timber joists, but they couldn’t span fully across the ~7m garage
- Steel beam transfers loads down to foundations
- Beam installation support mentioned from a local company (ITM), helping with lift positioning.
- Installed a major steel beam over the garage:
Roof, cladding, and weatherproofing
- Roof framing:
- Front: ~8° rafter roof
- Back: ~5° truss roof
- Roof product:
- Roofing iron, profile “Mc700” (trapezoidal)
- Notes a mix of overhangs/no-eaves areas around openings.
- Cladding:
- Hardie/Hardis “Home RB” (described as a solid skin/cladding layer)
- Weatherproofing milestone:
- During NZ COVID-era nationwide shutdown, they temporarily paused.
- Because lockdown timing was uncertain, they were glad they installed RAB/redboard (weather-tight; described as standing up to 180 days).
Lockdown effect (4–6 weeks)
- The Prime Minister announced a 4-week nationwide shutdown, which extended to 6 weeks.
- They shifted into “closedown mode,” relying on the weatherproofing already installed.
Services, insulation, plaster, and internal finishes
- Electrical/plumbing preparations:
- Pre-piping and planning for an 8kW heat pump.
- Insulation upgrade:
- Installed Pink Batts and calls it a “best bang for buck” comfort improvement.
- Plastering:
- Jib plasterboard installed by a small crew, followed by painting and interior works.
- Flooring strategy:
- Hard flooring includes:
- Timber/wood overlay in main areas
- Tiles in wet zones
- Josh does/installs substantial floor work (notes ~200 hours).
- Hard flooring includes:
- Interior milestone:
- The “touchable” finished wall transition happens once plaster goes on.
Kitchen, fireplace, and notable design decisions
- Kitchen redesign:
- U-shaped peninsula didn’t work, so they changed to a walk-around island/peninsula layout.
- Feature storage concepts mentioned (e.g., “magic corner”/draws).
- Fireplace choice:
- Plyc fire with a wet back for efficiency.
- Required a 20mm insulating non-combustible board under it for safety.
- Custom edging built with wood trim for tile transitions.
Deck, windows, skylights, and outdoor works
- Deck:
- Large deck supported by a portal/frame straddling the studio so loads transfer to both sides.
- Steel beam installed first, then joists; sloping sides created extra work.
- Balustrade:
- Aluminum fins made in Auckland and shipped down.
- Landscaping:
- Many finishing touches come as smaller tasks:
- Planter boxes filled
- Garden/feature areas and stone/golf-ball-style pavers (staggered random sizes)
- Firewood shed
- Stair work to connect levels
- Work-from-home office area
- A workshop-style mini ramp for kids/family use
- Many finishing touches come as smaller tasks:
“What I’d do differently” (lessons learned)
- Wear steel caps when mowing.
- Think earlier about landscaping:
- Waiting until the building was in place meant more carrying by hand.
- Fireplace aesthetics and storage:
- Would lift the fireplace higher to improve appearance and allow wood storage underneath.
- Subfloor choice:
- Would likely change away from timber subfloor due to sound/noise transfer (“elephant feet” stomping sounds).
- Door upgrade:
- Use solid-core interior doors to reduce noise.
- Floors:
- Would consider alternatives to the timber overlay floor method.
- Keep many good upgrades:
- Hardie/RB cladding
- Insulation
- Skylights
- Consistent interior joinery height matching external (noted as ~2.2m)
- Some window framing changes were made later on-site.
Skills, time investment, and financing (process mindset)
- Skills development:
- NZ building apprenticeship (3–4 years) to build capability.
- Builds experience through multiple sites before taking this one on personally.
- Mental commitment:
- Took a year off work, treating the project as a full-time mental undertaking, not just physical site time.
- Financing:
- Used savings (no bank loans).
- Mentions a cash reserve around $810k from selling prior properties/investments (“pot of gold”).
High-level cost breakdown (as stated)
Note: Costs are from 2019 pre-COVID price levels; build rates rose afterward. Josh also had industry reputation and supplier channel deals.
- Total approach (key lines):
- Section: $265k
- Drainage/power fixes (plus legal fees included in “all in”): effectively ~$285k all-in for section + legal/related (wording suggests combined total)
- Plans/design/engineer/council fees: ~$25k
- Excavation: $6k
- Drilled piles: $8k
- Garage slab (66m² slab cost): ~$72k
- Mid-floor materials & labor: $24k
- Frames: $22k
- Spouting + roofing: $119k
- Building materials incl. cladding: $70k
- Steels (items): $2k
- Insulation: $5.5k
- Garage door: $22k
- Windows: $21k
- Electrical: $22k
- Plumbing: $155k
- Infinity/gas + gas hot water (downstairs): $2k
- Heat pump: $32k
- Ducted system: $22k
- Fireplace + wet back: $5.2k
- Plastering inside: $6.5k
- External paint DIY: $1.2k
- Interior painting by painter: $72k
- Kitchen: $20k
- Appliances: ~$7.2k
- Carpet: $7.5k
- Tiles: $2.3k
- Shower glass: unclear (subtitles unclear; later mentions bathroom fittings as $10k)
- Timber wooden flooring: $8k + 200 hours labor + $1k glue
- Bathroom fittings: $10k
- Concrete driveways: $7.5k
- Landscaping/planter boxes: $6k
- Landscaping more broadly mentioned later as ~$18k, deck: $18k
- Blinds: $3k
- Wardrobes: ~$2k?
- Steel portal for deck: $2k
- Steel beam for garage: $800
- Josh’s summary:
- Start total: “just under $800k” including section and build (subtitles suggest ~$265k section + ~$465k build, with remaining costs beyond that).
- He values the final end product as “in the mid ones.”
Final reflection & encouragement
- He calls building both rewarding and taxing, and says it helped grow his YouTube channel and building company.
- Advice:
- Break big projects into small steps.
- Plan, solve constraints, and keep moving forward despite setbacks.
- If an “aha” moment happens, write it down and act on it.
Notable locations/products/people (from subtitles)
- Locations:
- New Zealand
- Upper Hutt (suburb)
- Kapiti Coast (factory trip)
- Nearby greenery/remu/manuka area for a preview of the next build
- Products/materials:
- Pink Batts
- Hardie/RB board (Home RB / Hardis) cladding/skin
- RAB/redboard weatherproofing
- Mc700 trapezoidal roof profile
- Hard flooring + tiles
- Plyc fireplace with wet back
- Skylights
- Organizations/companies/people:
- NZ Prime Minister (lockdown announcement)
- ITM (help with steel beam lift)
- Adam and an on-site crew (plaster/works mentioned)
- Hardies (cladding mention)
- Pink Batts (brand reference)