Summary of "Plattenfundament mit Gehwegplatten verlegen | OBI"

Plan to shop at the OBI market for the project and set aside 2-3 days depending on the weather.

Hire a helper for assistance.

Plan the location and larger foundation, clear the area, excavate the ground, set up cord scaffolding, and compact the area with a vibration plate.

Lay the base layer for the slab covering, level the compensation layer, and finally link the terrace slabs.

Use a bricklayer's cord, spirit level, and construction square for accuracy.

Set a gradient of two percent for proper rainwater drainage.

Use a vibrator or vibration plate to compact the ground and gravel.

Mix wet concrete for edge edging, stabilize with a back support, and adjust the edge stones.

Use a Motorflex for adjusting edge stones if needed.

Lay the base layer for the slab covering, level it, and lay the terrace tiles with uniform spacing.

Compact the gaps with jointing play and basalt mail.

Enjoy the finished slab foundation for a terrace or tool shed.