L-2.4: Shortest Job First(SJF) Scheduling Algorithm with Example | Operating System
Main summary
Key takeaways
Main ideas / concepts covered
-
Shortest Job First (SJF) Scheduling Algorithm
- Decision criterion: select the process with the smallest Burst Time.
- Variant used: Non-preemptive
- Once a process gets the CPU, it runs to completion without interruption.
-
Goal of the numerical problem
- For each process P1, P2, P3, P4, compute:
- Completion Time (CT)
- Turnaround Time (TAT)
- Waiting Time (WT)
- Response Time (RT) (noting when it can be omitted)
- For each process P1, P2, P3, P4, compute:
Methodology / step-by-step procedure (as demonstrated)
-
Inputs (given in the numerical)
- For processes P1, P2, P3, P4:
- Arrival Time
- Burst Time
- The specific arrival and burst values are used consistently throughout the Gantt chart.
- For processes P1, P2, P3, P4:
-
Step 1: Build the Gantt chart timeline
- Start time = 0
- For each time segment:
- Check which processes have arrived by the current time.
- If no process has arrived, the CPU stays idle (example: from 0 to 1).
-
Step 2: Select the next process
- Among arrived processes, pick the one with minimum Burst Time.
- Since scheduling is non-preemptive, the chosen process runs until it finishes.
-
Step 3: Handle ties (equal Burst Time)
- If multiple arrived processes have the same Burst Time:
- Prefer the one with earlier Arrival Time.
- If Arrival Time is also the same, use the lower Process ID (smaller numbered process).
- If multiple arrived processes have the same Burst Time:
-
Step 4: Compute completion times from the Gantt chart
- Read CT from the points where each process finishes.
- Example completion times used:
- P3 completes at 3
- P1 completes at 6
- P2 completes at 10
- P4 completes at 14
-
Step 5: Compute Turnaround Time (TAT)
- TAT = Completion Time − Arrival Time
- Example values:
- P1: 6 − 1 = 5
- P2: 10 − 2 = 8
- P3: 3 − 1 = 2
- P4: 14 − 4 = 10
-
Step 6: Compute Waiting Time (WT)
- WT = TAT − Burst Time
- Example values:
- P1: 5 − 3 = 2
- P2: 8 − 4 = 4
- P3: 2 − 2 = 0
- P4: 10 − 4 = 6
-
Step 7: Response Time (RT) guidance
- For non-preemptive SJF, Response Time = Waiting Time, so it’s often not required separately.
- Response time definition (as stated):
- RT = time when a process first gets CPU − Arrival Time
- RT differs mainly in preemptive scheduling, where the CPU may switch and a process can wait before running again.
-
Step 8: Compute averages (if asked)
-
Average Turnaround Time
-
[ \frac{\text{Sum of all TATs}}{\text{number of processes}} ]
-
Example:
- ((5 + 8 + 2 + 10) / 4 = 25 / 4 = 6.25)
- Average Waiting Time
-
[ \frac{\text{Sum of all WTs}}{\text{number of processes}} ]
-
Example:
- ((2 + 4 + 0 + 6) / 4 = 12 / 4 = 3)
-
-
Speakers / sources featured
- Gate Smashers (channel/creator credited in subtitles as “Gate Smashers”)
Rate this summary
Your feedback will help improve summaries.
Improve this summary
Reprocess with a stronger model when the summary feels incomplete or inaccurate.
Translate summary in another language
Ask questions to this video
Chat for follow-up questions, clarifications, and source-backed answers.