Material Requirement Planning (MRP) in SAP | MM-PP-SD Integration Explained with end to end SAP Demo

Main summary

Key takeaways

Educational

Main ideas, concepts, and lessons

  • Purpose of MRP (Material Requirement Planning)

    • MRP is presented as a central SAP planning concept that coordinates end-to-end logistics across major areas: MM, PP, and SD.
    • It exists to solve a coordination problem where departments work “in silos”:
      • Sales needs fulfillment
      • Warehouse has stock (or not)
      • Production needs the right materials to start
      • Procurement needs to buy missing raw materials
    • Key outcome: ensure the right material / component is available at the right time in the right quantity to fulfill demand and avoid delivery delays.
  • How MRP works conceptually (business flow)

    • Customer demand triggers sales orders.
    • If finished goods are not in warehouse stock, production must produce them.
    • Production needs component/raw materials.
    • If components/raw materials are not in stock, procurement must buy them from vendors.
    • MRP acts as the “binding element” that monitors stock and demand and automatically generates the planning documents that drive procurement and production.
  • MRP’s core technical jobs in SAP

    • Collect demand (from different “demand elements”).
    • Check material availability against existing stock.
    • If short, generate:
      • Planned orders (for in-house production items)
      • Purchase requisitions (for externally procured items)
    • Those proposals are then processed by respective departments:
      • Planned order → production order → goods receipt → stock updated
      • Purchase requisition → purchase order → goods receipt → stock updated

Demand-based planning (deterministic MRP / “MRP”)

Meaning

  • Planning is driven by explicit demand elements that exist in SAP.
  • The MRP run looks at those demand records and generates proposals to fulfill them.

Common demand elements described

  • Sales order (demand from customer)
  • Planned independent requirement (PIR) (forecast-based demand)
  • Dependent requirement (derived from the product structure/component list via MRP for the finished good)
  • Safety stock (buffer requirement; treated as additional demand)
  • Reservation (explicit reservation of material)

Safety stock and reservation are described as ways to create demand when it’s not tied directly to SD/PIR.

End-to-end instruction-style cycle (as described)

For make-to-order (customer-specific production)

  • Create sales order (T-code: VA01)
  • Run MRP (T-code: MD03)
  • If shortage: system creates planned order
  • Convert planned order → production order
    • from MD04 planned order view
  • Create/release production execution artifacts
  • Post goods receipt to update warehouse stock (T-code: MIGO)
  • Deliver to customer:
    • Post delivery / goods issue for sales order (T-code: VL01N)
  • Result: sales order fulfilled by stock created via MRP-driven production.

For make-to-stock (forecast-driven production)

  • Create planned independent requirement (PIR) (T-code: MD61)
    • Using a planning horizon (e.g., 2 months)
  • Ensure a requirement type exists for the material/plant (example shown: LSF)
  • Run MRP (T-code: MD03)
  • If shortage: system creates planned orders against PIR
  • Convert planned order → production order
  • Produce and post goods receipt (T-code: MIGO)
  • Material remains in warehouse stock, later used to fulfill customer sales orders when they arrive.

Safety stock as demand (buffering)

  • Enter safety stock in the material master (T-code: MM02 → MRP 2 view)
  • Run MRP (MD03)
  • If available stock < safety stock requirement: MRP creates a planned order to replenish up to the safety stock level.

Dependent requirements (component list logic)

  • When MRP runs for a finished product (e.g., bicycle), the system automatically creates:
    • Dependent requirement for semi-finished goods (e.g., frame)
    • Dependent requirement for raw materials (e.g., steel sheet)
  • The process repeats at each level:
    • Dependent requirement → planned order for manufactured item
    • Dependent requirement → purchase requisition for procured item
    • Planned orders → production orders → goods receipts
    • Purchase requisitions → purchase orders → goods receipts

Important lesson

  • Demand-based planning requires a demand element to exist in the system.
  • Without a demand element, MRP will not generate production/purchase proposals (in the demand-based philosophy).

Consumption-based planning (CBP / for low-value items)

Meaning

  • Planning is not driven by current/future demand elements.
  • Instead, it is based on past consumption patterns (historical usage), because the items have:
    • low value
    • relatively stable consumption
  • Goal shifts from “fulfill demand” to “replenish stock.”

Planning procedures mentioned

  • Reorder point planning
  • Forecast-based planning
  • Time-phased planning (mentioned as part of consumption-based planning)

Instruction-style cycle (as demonstrated: reorder point planning)

  • Create a consumption-based material master:
    • Set MRP type = VB in MM01
    • Set a reorder point value (manually calculated externally in the demo)
    • Procurement type is implied as external for consumables/raw materials
  • Ensure no external demand elements are required (no sales orders/PIR needed).
  • Run MRP live for the material (T-code: MD01N)
  • If available stock < reorder point: MRP generates purchase requisition
  • Convert PR → purchase order (from stock requirement context)
  • Post goods receipt (T-code: MIGO)
  • Result: stock replenished according to reorder-point logic, independent of sales order timing.

Important lesson

  • Consumption-based planning uses past consumption (or derived reorder/forecast data), not demand elements like sales orders or PIR.
  • The demo highlights that there may be no requirement records in the system, yet MRP still triggers replenishment proposals due to reorder-point settings.

Comparison: Demand-based vs Consumption-based (as stated)

  • Demand-based planning

    • Driven by demand elements:
      • sales orders, planned independent requirements, dependent requirements, reservations, safety stock
    • Focus: fulfill demand
    • MRP run generates:
      • planned orders + purchase requisitions (if shortage)
  • Consumption-based planning

    • Driven by replenishment logic based on:
      • reorder point / forecast-based / time-phased methods
    • Focus: replenish stock
    • MRP run generates purchase proposals (e.g., purchase requisitions) even without explicit demand records
  • Acronyms:

    • Demand-based planning called deterministic MRP
    • Consumption-based planning called CBP

SAP demo: what was shown (end-to-end)

Demo case 1: Demand-based planning using a sales order (make-to-order)

  1. Create material master for finished good:
    • MM01 with MRP type PD
  2. Create sales order:
    • VA01
  3. View requirement and stock requirement list:
    • MD04 (shows demand = sales order quantity, stock nil, shortage shown)
  4. Run MRP:
    • MD03
  5. Planned order created:
    • visible in MD04
  6. Convert planned order to production order:
    • from MD04 via conversion action/button
  7. Release/save production order
  8. Post goods receipt:
    • MIGO (against production order)
  9. Deliver/issue to fulfill sales order:
    • VL01N
  10. End state:
    • stock updated then depleted through delivery; sales order cleared.

Demo case 2: Demand-based planning using PIR (make-to-stock)

  1. Create planned independent requirement:
    • MD61
    • Enter planning horizon (e.g., 2 months) and quantities
    • Handle requirement type setup (LSF make-to-stock)
  2. View PIR in MD04
  3. Run MRP:
    • MD03
  4. Planned orders created from PIR
  5. Convert planned order → production order
  6. Goods receipt:
    • MIGO
  7. End state:
    • finished goods stored; PIR fulfilled.

Demo case 3: Demand-based safety stock

  1. Enter safety stock in material master:
    • MM02 (MRP 2 view)
  2. Run MRP:
    • MD03
  3. Planned order created for safety stock deficit.

Demo case 4: Consumption-based planning (reorder point)

  1. Create material for consumption-based planning:
    • MM01 with MRP type VB
    • Enter reorder point (manually, based on past consumption)
  2. Execute consumption-based MRP:
    • MD01N
  3. System creates purchase requisition for reorder-point deficit
  4. Create purchase order and post goods receipt:
    • Purchase order creation then MIGO goods receipt
  5. Stock replenished accordingly.

Speakers / sources featured

  • Single speaker: the video author/host (“Hey everyone… Welcome back to my channel…”), with no other named individuals or external sources mentioned.

Rate this summary

Your feedback will help improve summaries.

Improve this summary

Reprocess with a stronger model when the summary feels incomplete or inaccurate.

Pro

Translate summary in another language

Pro

Ask questions to this video

Chat for follow-up questions, clarifications, and source-backed answers.

Coming soon

Share this summary

Original video