Video summary

How to Assemble a Pool Table / How to Put Together a Pool Table (COMPLETE GUIDE)

Main summary

Key takeaways

Educational

Main ideas / lessons conveyed

  • The video is a complete, start-to-finish guide to assembling/reassembling a pool table, delivered as an unedited walkthrough (with only very brief recording interruptions).
  • A key theme is organization and correctness:
    • Separate hardware by type.
    • Verify quantities.
    • Reassemble using the right parts in the right places.
  • Another major theme is precision leveling:
    • Level the frame head-to-toe first using carpenters levels and shims.
    • Then level slate and align slate seams using a machinist’s level, wedges, and screws.
    • Finally level side-to-side using careful lifting and thin wood shims (where possible).
  • The builder prioritizes professional best practices, including:
    • Avoid “chasing” the level endlessly.
    • Keep the table surface clean during critical steps.
    • Use appropriate materials/techniques for bridging slate seams (prefers bondo over wax/plaster options and explains why).

Step-by-step methodology / instructions (detailed)

1) Prepare and sort hardware (very important)

  • Go through the entire pile/batch of hardware and separate items by type.
  • Count everything as you sort so you can confirm you have the correct quantities (use known counts based on the table’s design).

Example counting logic mentioned:

  • Know how many:
    • corner frame bolts
    • rail threaded rods
    • washer-and-nut sets
    • slate screws
    • leg bracket bolts, etc.

Why counting matters:

  • If the table was disassembled earlier (days/weeks/months), counting helps you remember what belongs where and prevents “missing/incorrect bolt length” mistakes.

Identifying bolt groups by length:

  • Bolts for leg brackets vs pocket bolts can be different lengths.
  • If you have 16 shorter bolts vs 12 longer pocket bolts, that tells you which group belongs where.

2) Assemble the frame

  • Separate and stage the necessary bolts/washers/caps/machine screws.
  • Lay frame panels so they are flat on the ground:
    • Ensure the top edge across both panels is level at the start to prevent future slate “high spot” issues.
  • Assemble corner/outer components first and loosely/structurally secure as needed before final tightening.
  • Have help tighten and finish securing pieces once bolts are started.

3) Install legs (initially loosely, then secure in the correct way)

  • Lift one side of the frame, install a leg bolt/leg bracket bolt to hold position without fully tightening.
  • Repeat for the other legs.
  • For reinstallation where holes match previous locations:
    • Align each leg to the original sheet metal screw holes.
    • Drive screws back in.
    • Twist/rotate the leg until holes line up exactly, then tighten down.
  • After sheet metal screws are installed, tighten the leg bolts.

4) Center the table in the room before leveling

  • Measure and mark the center of the table on top of the frame.
  • Measure the room width, compute half, and place the table at that center mark.
  • Position by measuring from a consistent wall (avoid mixing reference walls).
  • Adjust back-and-forth:
    • Move head/foot to keep alignment consistent.
    • Recheck both ends after any movement.
  • At this stage the table is positioned/centered; final leveling comes next.
  • The narrator notes they typically position where they think appropriate, then bring the customer in to confirm/adjust.

5) Level the frame head-to-toe (rough leveling)

  • Use carpenter’s levels (one 4-foot and one 2-foot) for rough frame leveling.
  • Shim under/at necessary areas (uses free Home Depot floor sample tiles as shims).
  • Important leveling rule:
    • Don’t get into “chasing the bubble around” endlessly.
    • Stop when 3 sides are level and handle the remaining correction later using slate leveling.

6) Install slate (three-piece slate), and align/level it using machinist-level precision

  • Corner miters/covers may be installed before slate depending on stage.
  • Place the first slate:
    • Ensure proper relative position (slate may include an arch/pattern indicating orientation).
    • Don’t bolt down immediately to fully start—start by positioning correctly.
  • Slate alignment method:
    • “Pinned slate” historically used metal dowels to prevent mix-ups.
    • For modern tables, alignment is done using:
      • large scratch awls as drift pins / alignment aids
      • correctly aligning screw holes and slate seams
  • Install all three slates first (relative position), then begin leveling.
  • Use a machinist’s level:
    • Accurate; small debris can affect readings.
    • Sweep the slate surface so nothing interferes.

Leveling procedure concept:

  • Identify which slate edge is high/low.
  • Screw down only enough to secure high-end logic, then use wood door/window wedges between frame and slate to adjust height.
  • Raise the low area slightly above level with wedges, then tighten screws to pull it back to exactly level.

Repeat for:

  • End slates to match across seams.
  • Middle slate:
    • If middle slate reads low/high at a side:
      • raise that side with wedges until it’s “just a touch high”
      • then tighten screws down to level it.

7) Finish slate work

  • After all slate screws are tightened and seams feel correct:
    • Check seams to ensure nothing shifted.
  • Break off excess wedge material with an attack hammer.
  • Clean table surface thoroughly.

8) Fill seams between slate sections

  • Preferred method: bondo.
  • Reasons given against alternatives:
    • Beeswax/paraffin wax: in hot environments, oils can migrate through cloth, causing oil slicks.
    • Plaster of Paris: becomes brittle over time and can break out and produce debris/powder.
    • Melting wax introduces a fire hazard in a customer’s home.

Process:

  • Scrape old residue with a palette knife.
  • Re-clean top surface.
  • Apply bondo.
  • Allow drying time (often ~5 minutes; depends on mix/hotness).

9) Recover cloth (customer-requested reuse in this video)

  • Optionally shake/inspect cloth before installing.
  • Use a pneumatic staple gun (Senco/Senco-like discussed) rather than manual electric ones to reduce failures and improve efficiency.

Stapling rules mentioned:

  • Don’t over-staple: “You’re holding cloth down,” not overbuilding.
  • For reused older cloth:
    • Don’t stretch it tighter than it was when removed (risk of ripping, especially ~13-year-old cloth).
  • Align fold lines and rail bolt holes carefully.
  • Start from a consistent side/section (middle to out, or corner to corner depending on cut/folds).
  • Additional staples mainly near pocket ends.

Pocket trimming and safety:

  • Use a razor blade to trim excess cloth around pockets/areas as needed.
  • Staple/prepare pockets and remove old staples from pocket areas for safety and a clean upholstery surface.

10) Install rails and pockets, then level side-to-side

  • Assemble/install rails in two halves (as practiced here).

Safety/planning before final assembly:

  • Determine which direction balls should break if they fly off (avoid breakables like windows).
  • Set head rail vs foot rail orientation considering name plate positioning.
  • Confirm tassels/pocket accessories:
    • Pull tassels back so they are not pinched between rail and pocket.

Pocket bolt tightening:

  • Avoid over-tightening:
    • If bolts are too long, they can break out the rail drilling area.
  • Stop/limit tightening when it begins to bind.

Rail bolt / threaded rod handling

  • Start threaded rods with only a few turns (don’t bottom them out).
  • Coordinate flipping/placement:
    • Rails can crack if timing/coordination between helpers is off.
  • Ensure leather/pocket material is not pinched when rails are positioned.

Secure rails

  • Snug/secure end bolts, then tighten remaining bolts.
  • Use a 4-foot level against rails to confirm straightness.
  • Stop using impact once alignment is confirmed.

Determine dot positions for racking

  • Use a duct tape + string method:
    • Tape string across the name plate center on head rail.
    • Tape string across specific diamonds on opposite rail(s).
    • The intersection defines the rack “dot” location.

Final leveling: side-to-side

  • Sweep and remove tools; use machinist’s level.
  • If the frame has a lip allowing safe access:
    • Lift table carefully with help.
    • Use very thin wood shims (~1/32 inch or less) under the needed side.
  • Check both ends after adjustment (in this case it required no further correction).

11) Final cleanup and customer walkthrough

  • Sweep/clean the top surface.
  • Allow customer to walk around and check where levels are placed.
  • Finish with general wrap-up guidance:
    • Use the video as a reference and jump to time-stamped sections.

Speakers / sources featured

  • Doug Giles
    • Primary speaker; narrator and pool table restorer/installer
    • Host of “Creative Restorations” channel
  • David
    • Doug’s helper/assistant
    • Helps with camera, tightening, slate alignment, cloth stapling, pocket work, and other assembly tasks
  • Customers
    • Mentioned as people Doug and David work with (specific individuals not named)

References / external mentions

  • Preston Soto (referenced as a channel whose viewers may have come over)
  • The Elegant Oxford (referenced channel)
  • Steve Dedoclient / Beato’s Leatherworks (referenced as another crafts/leatherwork-related channel)
  • Home Depot
    • Source for free floor sample shims
    • Also mentioned for wedge/shims/materials
  • Senco
    • Pneumatic stapler brand mentioned

Rate this summary

Your feedback will help improve summaries.

Improve this summary

Reprocess with a stronger model when the summary feels incomplete or inaccurate.

Pro

Translate summary in another language

Pro

Ask questions to this video

Chat for follow-up questions, clarifications, and source-backed answers.

Coming soon

Share this summary

Original video