Housing Innovation Network (HIN) Grants Program — Business Summary

Program purpose & strategy

  • Goal: Increase adoption of local innovation into the delivery and maintenance of social housing in NSW.
  • How it fits broader policy:
    • NSW Industry Policy missions: Housing, Net Zero & Energy Transition, Local Manufacturing
    • NSW Innovation Blueprint action: Housing Innovation Network to connect stakeholders to drive development, demonstration, deployment, and commercialization of new housing technologies
  • Core model: A challenge-based, pilot funding mechanism that links Homes NSW operational environments with NSW-based SMEs offering solutions (including prop tech and housing tech).

Operating model / execution playbook (what winners get)

  • Two-part support after selection:
    • Investment NSW: provides grant funding to pilot
    • Homes NSW: provides access to its operating environment and staff to test, trial, and improve the solution
  • Outcome expectation:
    • A solution field-tested with a potential customer
    • Homes NSW gains practical understanding of how solutions can improve social housing delivery/maintenance via:
      • faster
      • lower cost
      • more sustainable operations

Grant structure (key terms)

  • Funding type: Open competitive grant (1-stage application)
  • Funding pool: $1.8 million total
  • Grant size: Up to $250,000 per project
  • Coverage: 100% of total eligible pilot costs
  • No minimum grant amount
  • Code contributions: Not required (voluntary only)
  • Eligible applicants (examples):
    • NSW-headquartered SMEs (business eligibility per guidelines)
    • Aboriginal or Torres Strait Islander corporations
    • NSW universities / publicly funded research organizations
      • If successful, they must spin out a business so Investment NSW can fund via a business funding agreement (grant is business-focused)

Eligible solution requirements (business logic)

  • Must address one of nine specific challenge areas.
  • Solution maturity:
    • Must be beyond early-stage
    • Suitable for pilot testing
    • Either:
      • Not yet commercialized, or
      • Commercialized in other settings but not yet tested in NSW social housing
  • Repurposing is encouraged (e.g., selling into private housing, schools, hospitals, transport contexts—then adapting to social housing).

Evaluation framework (assessment criteria)

Applications are scored against 4 criteria, with sub-components:

  1. Challenge fit & benefits

    • Measurable value: how well the solution addresses the challenge + value proposition
    • Long-term public benefit & alignment: alignment with NSW social housing priorities/investments
  2. Deliverability of the pilot

    • Plan: clear, realistic, good value for money, risk considered
    • Resourcing: identified resources + considered access/support from Homes NSW
    • Team capability: technical + commercial ability to run the pilot and capture value
  3. Commercial viability & scale-up potential

    • Innovation: differentiation vs existing market solutions
    • Market opportunity & demand: market size, customers, assumptions
    • Go-to-market & commercialization strategy: adoption path and scaling approach
  4. Financial viability

    • Organization must demonstrate it can manage the pilot with grant funding (important for newer startups)

Timeline & milestones (execution cadence)

  • Applications open: ongoing
  • Closes: Wednesday 9 September 2026 (late applications not considered)
  • Successful applicants notified by: November 2026
  • Earliest grant activity start: Q4 2026
  • Pilot duration: up to 12 months
  • Expected completion for most projects: by Q4 2027

The nine Homes NSW challenges (operational problem statements)

Challenge 1: “Open kit of parts” for Modern Methods of Construction (MMC)

  • Objective: Move from overly bespoke designs to standardized, interoperable components that can be combined into faster, lower-risk builds.
  • What a good solution looks like:
    • Components (e.g., wall/floor systems) that slot together with other suppliers’ systems
    • Compatibility with BIM / CAD workflows
    • Configurable digital + physical product integration
    • Support factory-based delivery to minimize waste and improve performance
  • Reference example mentioned: “System 600” as baseline compatibility

Challenge 2: Auto-populating planning due diligence feasibility templates

  • Context: Feasibility work currently involves manual Excel/Word templates and data copied from many systems.
  • Objective: Automate data ingestion into structured templates to reduce:
    • duplication/copy-paste
    • error risk
    • manual effort
  • Need: integration into Excel/Word templates structured to planning legislation clauses (dynamic as legislation changes)
  • Data sources mentioned (examples):
    • NSW Planning portal/spatial viewer
    • Homes NSW property viewer
    • “SEED mapping” (biodiversity)
    • metroMap / Google Maps
    • Land title documents (often currently PDFs → manual)
    • “Before you dig” (infrastructure constraints)
    • Transport NSW OPAL / bus timetable accessibility info

Challenge 3: One-stop site feasibility tool (visual block options / yield accuracy)

  • Objective: Replace approximate tools (e.g., yield-from-GFA only) with something that:
    • synthesizes compliance, legislation, and site risk
    • produces a clear visual development fit/diagram
    • yields clearer, more accurate yield counts by typology and design constraints
  • Scope: ideally works across multiple typologies (granny flats → ~100-unit apartments), and integrates with:
    • MMC approaches
    • government architects’ established multi-dwelling/apartment “patent books”
  • Current pain: pulling info from PDFs/Word docs → time-consuming synthesis

Challenge 4: Smart wall systems & façade elements (durable, low-maintenance, tenure-blind)

  • Tenant/asset context:
    • Many tenants are aging-in-place (approx 93% rely on age/disability/pension income)
    • Need accessibility, wellbeing, varying mobility, and mental health considerations
  • Design priorities:
    • Durable, impact-resistant, low-maintenance wall/façade solutions
    • Improve running costs for tenants (thermal performance)
    • “Tenure blind” appearance (must look like quality private market developments)
    • Prefers refinement/adaptation of existing products over reinventing fully new ones
  • Broader outcomes: sustainability/circularity, reuse, retrofit of existing buildings, cultural design elements, neurodiversity/wellbeing supports
  • Energy generation noted as least critical among criteria (per speaker)

Challenge 5: Automating scope creation from maintenance condition surveys

  • Operational stats cited:
    • Portfolio: ~126,000 properties (Homes NSW)
    • Managed by others (CHPs): ~35,000; Homes NSW: >90,000
    • Annual inspections: ~45,000 properties/year (~one-third of portfolio)
    • Work program outputs: ~4,000–6,000 properties/year
  • Current process: survey results → manual conversion into property-specific scope using inspectors + standard schedule of rates; includes desktop analysis but largely manual.
  • Objective: generate “scope straight from survey outputs” using automated techniques to:
    • speed response time
    • roll out programs more efficiently
    • improve scope accuracy and reduce variation during construction
    • better estimate future liability for remaining properties beyond the yearly work program
  • Homes NSW will provide to pilots: typical survey framework, schedule of rate work items, and sample test cases

Challenge 6: Automating maintenance contract audit checks (reduce manual, improve financial integrity)

  • Operational stats cited:
    • Reactive maintenance request/work orders: ~300,000/year
    • Including program/servicing: ~600,000+ work orders/year
    • Each work order: ~3 to 200 line items
    • Current: 9 auditors doing desktop audits
    • Audit types include:
      • process review + internal/external regulatory compliance
      • expenditure audit (warranty recall, duplicate works, recovery actions)
  • Objective: automate audit checks (incl. financial aspects) to:
    • detect errors/risk/overclaims faster
    • reduce reliance on low-volume random sampling
    • improve contractor performance decisions
  • Approach direction mentioned: considering AI tools to identify potentially problematic work orders rather than sampling

Challenge 7: Inspection & digital scoping for faster, safer maintenance (root-cause clarity)

  • Operational context & pain:
    • Hundreds of thousands of maintenance works annually
    • Trades may be sent multiple times because maintenance issues are difficult to assess and root cause isn’t identified
  • Impact areas:
    • higher costs from rework/trade callouts
    • tenant disruption and safety/reduced peace
    • potential relocation if property becomes uninhabitable
    • complaints/reputational risk
    • equity gap: metropolitan vs regional/rural constraints (less trade capacity)
  • Success looks like:
    • better data to inform faster, more cost-effective scoping and resolution
    • reduced trade dependency/time, especially in regional settings
  • Pilot concept: test across metro + regional with contractors partnership; focus on scoping to resolve issues timely

Challenge 8: Integrated planning & allocation for Key Worker housing (coordination across government)

  • Service model: role-based eligibility; agencies nominate key workers for hard-to-fill vacancies
  • Challenge:
    • allocate housing fairly and efficiently across dispersed agencies/workforces and 300+ communities
    • integrate diverse data for:
      • allocation across existing housing vacancies
      • planning for new investment where the housing market can’t meet workforce demand
  • Objective for solution:
    • create a matrix combining employment/workforce demographics + property market data
    • apply logic to produce allocation/planning insights with a near real-time view
    • reduce workforce and housing vacancies and unmet demand over time
  • Pilot openness: willing to pilot using subsets + subsets of portfolios and locations across NSW, using publicly available and government data (in principle)

Challenge 9: Immersive safety site access & compliance training

  • Problem: traditional training may not reflect real-world site conditions or prepare officers adequately.
  • Objective: create immersive, scenario-based training that builds:
    • hazard awareness + identification
    • correct assessment and response capabilities
    • confidence for officers/stakeholders in the field
  • Desired outputs:
    • clear, safe decision-making tools for site attendees
    • consistent, easy-to-understand training materials with varied delivery options

Q&A — notable business-operational clarifications

  • Multiple grants: Yes, you can apply for multiple; only disqualify if the same project/purpose was already funded by another NSW/state/territory/Australian government program.
  • Challenge 3 typology focus: prefer a tool that can test across typologies; also note most portfolio is apartments, but solution should assess best uplift across size.
  • Challenge 3 feasibility requirements: must test against Homes NSW design requirements + relevant legislation (e.g., Apartment Design Guide, solar testing, cross-ventilation) and “Good design for social housing”.
  • Post-pilot outcome: this is a grant program (not procurement)—Homes NSW could later procure via normal government procurement processes if desired.
  • Startups: allowed; selection impacted by financial viability scoring for very new entities.
  • Universities: can apply, but must spin out a business for Investment NSW funding agreement.

Key metrics / KPIs explicitly referenced (by Homes NSW challenges)

  • Portfolio size: 126,000 properties (Homes NSW)
  • Property mix: ~35,000 managed by community housing providers; >90,000 managed by Homes NSW
  • Inspections: ~45,000 properties/year (~1/3 of portfolio)
  • Annual maintenance work program scope target: ~4,000–6,000 properties/year
  • Reactive maintenance work orders: ~300,000/year
  • Total maintenance work orders (incl. program/servicing): ~600,000+ year
  • Work orders line items: ~3 to 200 per work order (audits)
  • Key worker allocation: housing across 300+ communities (for challenge 8)
  • Tenant income reliance statistic: ~93% rely on age/disability/other pension income (challenge 4)

Concrete actionable recommendations embedded in the webinar

  • Read grant guidelines + challenge statements before applying.
  • Ensure your pilot plan clearly includes:
    • Access/support needs from Homes NSW (deliverability criterion)
    • Risks and realistic schedule/plan (deliverability criterion)
    • A credible go-to-market/adoption path for scale (commercial viability criterion)
    • Financial viability evidence (especially important for startups)
  • Choose one challenge area and frame your solution as:
    • already test-ready (not early R&D)
    • adaptable to NSW social housing constraints (not just private market deployment)

Presenters / sources (named in subtitles)

  • Daniel Van Dijk — Investment New South Wales (host; grants overview & Q&A)
  • Alicia (MMC team) — Challenge 1 presenter (introduced via colleague)
  • Kevin — Challenge 1 / contributes to Challenge 3 section
  • Susanna — Acting Manager, Strategic Planning Team (Pipeline) — Challenge 2
  • Maddie (Melanie mentioned in Q&A) — Design Office — Challenge 4
  • Rajes Pancholi — Director, Major and Specialized Projects — Challenge 5
  • Berna Casey — Maintenance audit team manager — Challenge 6
  • Jaden Carling — Director, Maintenance Strategy and Projects — Challenge 7
  • Graeme — Strategy Manager (Keyworker housing) — Challenge 8
  • Alberto Marino — Director, Standards and Business Services — Challenge 9
  • Meline — Facade system Q&A (appears to be the same speaker referenced earlier for Challenge 4 via transcription variation)

Rate this summary

Your feedback will help improve summaries.

Improve this summary

Reprocess with a stronger model when the summary feels incomplete or inaccurate.

Pro

Translate summary in another language

Pro

Ask questions to this video

Chat for follow-up questions, clarifications, and source-backed answers.

Coming soon

Share this summary

Original video